Skip to content
TWINJAM

For software & web development agencies

Stop building free software features for demanding clients.

TWINJAM checks every Slack request, Jira ticket and pull request against the signed SOW, so the SSO flow nobody contracted arrives with a price instead of a weekend.

Works with Jira, Linear, GitHub, Slack and Teams. Read-only OAuth.
slack / #client-ridgewayFlagged
DW

Dana Whitlock Thu 4:12 PM

Field crews keep asking for Sign in with Apple and Google. Can we add both before the first crews get the app?

Private to #pm-scope-alerts · RWU-FIELD

Assumption A-2 Authentication is email and password with optional MFA. Third-party identity providers are out of scope.

Est. 26 hrs × $160 = $4,160Draft change order

Where engineering margin goes

Four requests that sound small and never are.

In fixed-fee engineering, the expensive requests rarely look expensive. They arrive as one-line Slack messages and turn into auth providers, new services and extra release cycles.

Uncontracted third-party API changes

The client switches payment provider mid-build, or asks you to “also pull history from the old ERP”. A PR adds a new SDK and nobody connects it to the contract.

RWU-148Integrate Esri ArcGIS basemap tilesScope drift
RWU-151Inspection form field validationIn SOW
RWU-157Sync work orders from Maximo APIScope drift

Unexpected authentication flows

SSO, social login, role hierarchies and magic links. Each one touches security review, testing and the release pipeline.

Typical size: 20 to 60 hrs

Custom reporting requests

“Can the export be a branded PDF?” “Can we add one more chart for the board?” Reports are the most common quiet add-on.

Endless staging QA cycles

The contract says three UAT rounds. Round four starts because a new stakeholder joined. TWINJAM counts rounds and flags the one beyond the cap before it begins.

R1R2R3R4

Real-world case walkthrough

How a 35-person dev agency recovered $18,400 on one React Native contract.

Stackwell Labs signed a $96,000 fixed-fee contract to build a field inspection app for Ridgeway Utilities. By week four, burn was running ahead of delivered milestones. Here is what TWINJAM caught, and when.

Read the full Stackwell Labs story
change-order / RWU-CO-01 to 04PM approved

Prepared for

Ridgeway Utilities

ItemHoursAmount
Sign in with Apple & Google SSOAssumption A-226$4,160
Offline capture & background syncAssumption A-448$7,680
Branded PDF compliance exportSOW §5.322$3,520
Fourth staging QA roundSOW §7.119$3,040
Total at $160/hr$18,400
  1. Week 0Setup

    The SOW becomes 52 boundary rules

    The delivery lead uploads the signed SOW. TWINJAM extracts 31 deliverables, 9 exclusions and 12 technical assumptions, including online-first capture, email-and-password auth and three staging QA rounds. Review takes 12 minutes.

  2. Week 2Slack

    SSO request flagged before a ticket exists

    The client asks for Sign in with Apple and Google in the shared channel. The PM sees the flag in #pm-scope-alerts with assumption A-2 attached, and sends a priced option the next morning.

    Change order$4,160

  3. Week 5Jira

    Offline sync ticket tagged Scope drift

    A Jira ticket for offline capture is created after a call. TWINJAM matches it against assumption A-4 and correlates a draft PR that adds a local database layer. The client signs in two days.

    Change order$7,680

  4. Week 7Slack

    Branded PDF report added as an option

    The SOW lists CSV and on-screen reports. The client wants a branded PDF for regulators. The PM offers it as a fixed-price add-on with the clause quoted.

    Change order$3,520

  5. Week 9Jira

    QA round four caught before it starts

    A new UAT round is scheduled after a stakeholder change. TWINJAM flags it against the three-round cap, and the client approves it as a change order rather than an assumption.

    Change order$3,040

  6. Week 12Result

    Four of four signed. No weekend crunch.

    All four change orders were signed for $18,400 across 115 hours at the contract rate of $160. The project closed on margin, and the mobile squad's unplanned weekend hours dropped sharply.

Engineering realization

See billable vs. unbilled scope hours by sprint team.

Margin Telemetry reads time from Harvest, Toggl Track or Clockify and splits every sprint into contracted work, approved change orders and unbilled scope. Switch teams to see where realization moved after rollout.

Agencies in our onboarding audit reclaimed an average of 18.4% of project margin on fixed-fee work (TWINJAM onboarding audit, 2026).

margin-telemetry / engineering realizationLive

Realization S11 to S13

82.1%

Realization S14 to S17

96.6%

Billed via change order

115 h

0135269TWINJAM onS11: 210 contracted, 0 approved, 46 unbilled hoursS11S12: 204 contracted, 0 approved, 52 unbilled hoursS12S13: 216 contracted, 6 approved, 41 unbilled hoursS13S14: 208 contracted, 26 approved, 14 unbilled hoursS14S15: 212 contracted, 48 approved, 9 unbilled hoursS15S16: 205 contracted, 22 approved, 6 unbilled hoursS16S17: 214 contracted, 19 approved, 5 unbilled hoursS17
ContractedApproved change ordersUnbilled scope (34 h since rollout)
“Our developers no longer get roped into weekend marathons for client favors. That alone changed how the team feels about fixed-fee work.”
PRPriya RamanVP of Engineering, Stackwell Labs

Fits your engineering stack

  • Jira logoJira
  • Linear logoLinear
  • GitHub logoGitHub
  • Slack logoSlack
  • Microsoft Teams logoMicrosoft Teams
  • Harvest logoHarvest
All integrations

FAQ

Questions engineering leads ask.

TWINJAM reads pull request metadata through a read-only GitHub connection: titles, descriptions, labels, changed file paths and linked issues. That is enough to detect new modules, services or SDKs that fall outside contracted assumptions. It never trains models on your code or client IP.

Estimates come from comparable closed tickets in your own Jira or Linear history, adjusted by the role-based or blended rate on the contract. PMs can edit every estimate before a change order is sent.

No. Flags go to a private PM channel and the triage feed, not to engineers. Developers keep working in Jira, Linear and GitHub exactly as before.

Yes. If the SOW caps QA or UAT rounds, TWINJAM tracks them from Jira releases, labels or Slack and flags the request that would open a round beyond the cap.

Protect your engineering margins.

Upload one live SOW and connect Slack and Jira. See the out-of-scope requests your engineers are building for free this sprint.